Technology Street

Find out how ITF is facilitating innovation & technology developments in the global oil, gas and energy industry.

ITF Technology Street



Investors in People | Gold

Completed Projects

Displaying 1 to 20 of 142

JIP Closed
Code Title Theme Sub-Theme Start





9087 Hydraulically Expandable Tubular System (HETS) - EXPANDABLE METAL PATCH FOR 4.5" AND 5" AND 5.5" TUBING/LINER (Internal Patch) Sustaining and Developing Production 2005
9068 Slickline Fatigue Project - Phase 2 Adhoc
9013 Develop Units of Competency that Establish Performance Criteria and Evidence Guides Adhoc 2010
4742 Continued Development of High Performance Coatings to Prevent Scale Accretion - Phase 1 Adhoc 2009
4672 Specialist Coatings - Application & Process Pioneer 2011
4632 UPTAKE-BioFibre Proof-of-Concept Study Adhoc 2010
4600 Onshore Pipeline Fabrication and Tow Feasibility Study Pioneer 2009
4575 Unmanned Production Buoy Adhoc 2009
4545 How can defence expertise and experience enhance Digital Oilfield initiatives? Cross Fertilisation 2008
4543 Radar for ice detection and characterisation Cross Fertilisation 2008
4464 Preliminary Development of High Performance Coatings for the Interior of Pipes and Tubes Adhoc 2008
4463 Novel Underwater Cutting Decommissioning Removal 2008
4434 Flexible Pipe Survey and Integrity Assurance Guidance Note Adhoc 2008
4411 LUX Monitor™ - development of a novel technology platform with applications for measurement of Oil-in-Water, Water-in-Oil and Droplet size Asset Integrity 2008
4403 Acoustic Inspection Gauge Asset Integrity 2008
4369 Hydrate Monitoring and Early Warning System Subsea Challenges 2007
4357 A Multiphase Cold Flow Assurance Solution Subsea Challenges 2007
4354 Real time condition monitoring of down-hole casings for identification and location of corrosion and water breakthrough Subsea Challenges Smart Subsea 2007
4335 Non Chemical Modular Gas Treatment Technology Production Capacity & Efficiency 2008
4334 Subsea Water Injection and Treatment Subsea Challenges Process 2007
4330 High Performance Non Pipe-in-Pipe Thermal Insulation System - Bubbletherm Phase 2 Adhoc 2006